Baoding Lekai Chemical Co., Ltd. Safety Evaluation Report

Time:2018-08-07
|
From:
|
Views:333
|
Font Size:Default Big Large
|
Print
|
1. Safety evaluation project name: Baoding Lekai Chemical Co., Ltd. light stabilizer production line project external safety protection distance special project safety evaluation report
2. Introduction to the safety assessment project:
Lucky Chemical Company was originally an organic workshop under China Lucky Film group company. In September 2002, it was jointly funded by China Lucky Film group company (hereinafter referred to as Lucky Film group company), Lucky Film joint stock company and 48 natural person shareholders. It was established as an independent legal person enterprise. The registered address of the enterprise is No. 18, Chemical Fiber East Road, Baoding City, with a registered capital of 5082561 yuan. The production site is located in the central and southern part of the courtyard of China Lucky Film group company, covering an area of 13640m2.
In order to deeply learn from the lessons of production safety accidents in the national hazardous chemical industry in 2015, resolutely avoid major casualties caused by the protection distance problem after the accident, provide reliable technical support for government supervision and management, and maximize the intrinsic safety of enterprises, the external safety distance of hazardous chemical enterprises is evaluated.
3. Safety evaluation project leader, technical leader, process control leader, evaluation report compiler, report auditor, safety evaluator, registered safety engineer, and technical expert involved in the evaluation:
    Safety evaluation project leader: Wang Tongen
    Technical person in charge: Zhou Junhong
    Person in charge of process control: Wang Lin
    Compilers of the evaluation report: Wang Tongen, Sun Guang, Ma Junxing
    Report Reviewer: Gao Weili
    Safety evaluators, registered safety engineers, and technical experts participating in the evaluation work: Wang Tongen, Sun Guang, Ma Junxinggao Wei Li, Zhou Junhong, Wang Lin
4. List of personnel, time, and main tasks to carry out safety evaluation work on site, and evaluation report time:
After the completion of the safety evaluation report of this special project, communicate and communicate with Baoding Lekai Chemical Co., Ltd. to exchange opinions with the unit on the objectivity and authenticity of this report and the proposed safety countermeasures and suggestions, and solicit the opinions of the evaluation unit on the content and conclusion of the project evaluation. The unit is not controversial. Our company formed an evaluation team attended by experts from all walks of life, consulted a large number of literature, laws and regulations, standards and technical materials, and went to the site for on-site inspection. On this basis, we carefully analyzed the specific situation of the evaluation project, prepared an evaluation outline, formulated a project progress plan, clarified the division of labor, and determined the purpose, principle and scope of this evaluation.