North China Pharmaceutical Joint Stock Company Safety Conditions And Facilities Comprehensive Analysis Report
Time:2018-08-17
|
From:
|
Views:341
|
Font Size:Default Big Large
|
Print
|
1. Safety evaluation project name: North China pharmaceutical joint stock company North China pharmaceutical overall relocation Beiyuan upgrade project safety production conditions and facilities comprehensive analysis report
2. Introduction to the safety assessment project:
In response to the relocation of industrial enterprises in the main urban area of the provincial capital, the land occupied by the North China Pharmaceutical General Factory needs to be demolished and relocated before the end of 2017. According to the overall deployment of the overall relocation of the North China Pharmaceutical Group, the North China Pharmaceutical joint stock company Beiyuan branch factory originally relied on the power, warehousing, quality inspection, environmental protection and other public auxiliary facilities of the main factory to achieve self-sufficiency. At the same time, according to the overall planning of the group, the project plan will integrate the power workshop, sewage treatment system, quality inspection center and storage area dispersed within the scope of the North China Pharmaceutical General Factory into the Beiyuan branch factory area. Complete quality inspection and transformation, power circulating water system and power distribution transformation inside Beiyuan Building No. 3 (former General Factory 117 workshop); complete power 7 degree water system, compressed air and nitrogen system transformation in the cold second area of Beiyuan Building No. 4 (former General Factory 109 workshop); on the south side of Beiyuan Building No. 3 Build a new underground fire pool and fire pump room (combined with doorman); build a new sewage treatment tank in the middle of the north side of Beiyuan Building 4, and complete the renovation of the sewage treatment station in the north of Beiyuan Building 4; build a new solid waste temporary storage room in the northwest of the factory area; connect municipal energy pipelines, reconnect public works, and lay steam, water supply, drainage, rainwater and other pipelines.
3. Safety evaluation project leader, technical leader, process control leader, evaluation report compiler, report auditor, safety evaluator, registered safety engineer, and technical expert involved in the evaluation:
Safety evaluation project leader: Xu Zhe
Technical person in charge: Cao Shuhua
Person in charge of process control: Wang Lin
Evaluation Report Compilers: Xu Zhe, Sun Guang, Gao Weili
Report Reviewer: Zhou Junhong
4. List of personnel, time, and main tasks to carry out safety evaluation work on site, and evaluation report time:
In December 2017, the preparation of the "North China pharmaceutical joint stock company North China pharmaceutical overall relocation Beiyuan upgrade project safety production conditions and facilities comprehensive analysis report".